1.75 km railway bridge with major transport significance and associated bank-protection works

Long-span railway bridge between Turkmenabat and Farap.

Long-span railway bridge between Turkmenabat and Farap.

ALTCOM delivered riverbank protection and regulating structures within the railway crossing over the Amu Darya. This scope extends for 3 km; the bridge itself is 1,750 m long.

Design capacity: Up to 5,000 m³/day

Design capacity: Up to 5,000 m³/day

SPIRO pipes: 2,000 mm diameter

Existing collector: 1,500 mm diameter

Existing collector: 1,200 mm diameter

System: SPIRO pipes and chambers

Riverbank protection: 3 km