Завантаження / Loading
You propose – we deliver
A wastewater treatment plant with a design capacity of up to 5,000 m³ per day.

TEKHEX designed and built the wastewater treatment plant in Orlivka. The facility has a design capacity of up to 5,000 m³ per day.
Design capacity: Up to 5,000 m³/day