You propose – we deliver

As part of Ukraine's preparations for the 2012 European Football Championship, a new terminal complex was built by the company at the "Donetsk International Airport". It includes a terminal with an area of 58 thousand square meters, an overpass, a three-story parking lot for 600 cars, a bus station, and other facilities. The new Donetsk airport terminal is equipped with the latest technology and designed to provide maximum comfort for passengers. The system of gates and telescopic ramps allows passengers to go directly from the plane into the building, and then, thanks to covered galleries, they can proceed to the parking lot or bus station without going outside. The terminal has separate "Arrival" and "Departure" zones, which is also important for people's convenience. As part of the reconstruction of the Donetsk airport, the tallest air traffic control tower in Ukraine with modern high-tech equipment was also erected.
The new Donetsk airport terminal is equipped with the latest technology and designed to provide maximum comfort for passengers. The system of gates and telescopic ramps allows passengers to go directly from the plane into the building, and then, thanks to covered galleries, they can proceed to the parking lot or bus station without going outside. The terminal has separate "Arrival" and "Departure" zones, which is also important for people's convenience.

As part of Ukraine's preparations for the 2012 European Football Championship, a new terminal complex was built by the company at the "Donetsk International Airport". It includes a terminal with an area of 58 thousand square meters, an overpass, a three-story parking lot for 600 cars, a bus station, and other facilities. The new Donetsk airport terminal is equipped with the latest technology and designed to provide maximum comfort for passengers. The system of gates and telescopic ramps allows passengers to go directly from the plane into the building, and then, thanks to covered galleries, they can proceed to the parking lot or bus station without going outside. The terminal has separate "Arrival" and "Departure" zones, which is also important for people's convenience. As part of the reconstruction of the Donetsk airport, the tallest air traffic control tower in Ukraine with modern high-tech equipment was also erected.
The new Donetsk airport terminal is equipped with the latest technology and designed to provide maximum comfort for passengers. The system of gates and telescopic ramps allows passengers to go directly from the plane into the building, and then, thanks to covered galleries, they can proceed to the parking lot or bus station without going outside. The terminal has separate "Arrival" and "Departure" zones, which is also important for people's convenience.






Riverbank protection: 3 km